Solar Sensor: Testing and Inspection
COMPONENT INSPECTIONSunload Sensor
Measure voltage between unified meter and A/C amp. harness connector M51 terminal 50 (LG) and ground.
If NG, replace unified meter and A/C amp.
- When checking sun load sensor select a place where sun shines directly on it.