Operation CHARM: Car repair manuals for everyone.

Removal and Installation

VK45DE ENGINE MODELS




Removal
1. Disconnect negative battery terminal.




2. Remove engine front and rear undercover, using power tools.
3. Disconnect S connector.
4. Remove B terminal nut.
5. Remove starter motor mounting bolts.
6. Loosen A/T fluid cooler tube clip bolts.
7. Remove starter motor to the direction of under side the vehicle.

Installation
Install in the reverse order of removal.

CAUTION: Be sure to tighten B terminal nut carefully.