Removal and Installation
VK45DE ENGINE MODELSRemoval
1. Disconnect the battery cable from the negative terminal.
2. Remove engine front and rear undercover using power tools.
3. Disconnect "S" connector.
4. Remove "B" terminal nut.
5. Remove starter motor mounting bolts.
6. Loosen A/T fluid cooler tube clip bolts. Refer to "TRANSMISSION ASSEMBLY".
7. Remove starter motor downward from the vehicle.
Installation
Installation is the reverse order of removal.
CAUTION: Be sure to tighten "B" terminal nut carefully.