Operation CHARM: Car repair manuals for everyone.

Removal and Installation

CHARGING SYSTEM

Removal and Installation (VK45DE Engine Models)

SC-25 Exploded View:






REMOVAL
1. Disconnect the battery cable from the negative terminal.
2. Remove engine front undercover, using power tools.
3. Remove radiator shroud (lower).




4. Remove alternator, water pump and A/C compressor belt.
5. Remove alternator mounting bolts, using power tools.




6. Disconnect alternator connector.
7. Remove "B" terminal nut.
8. Remove alternator ground harness mounting bolt.
9. Remove alternator assembly downward from the vehicle.

INSTALLATION
Installation is the reverse order of removal.
- Install alternator, and check tension of belt.

CAUTION: Be sure to tighten "B" terminal nut carefully.