Work Procedure
ADDITIONAL SERVICE WHEN REPLACING ICC SENSOR
Work Procedure
1. LASER BEAM AIMING ADJUSTMENT
Adjust the laser beam aiming. Refer to "Description" Description.
- GO TO 2.
2. DCA SYSTEM ACTION TEST
1.Perform the DCA system action test. Refer to "Description" DCA.
2.Check that the DCA system operates normally.
- INSPECTION END