Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
All9.87.0Includes: R&R Engine, Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Note
With Ac, Add0.50.3
With Auto Trans, Add0.40.2
With Ps, Add0.50.3
With Turbocharger, Add0.80.5
Right Bank
Note
With Ac, Add0.50.3
With Ps, Add0.50.3
With Auto Trans, Add0.40.2
With Turbocharger, Add0.80.5
Left Bank
Note
With Ac, Add0.50.3
With Ps, Add0.50.3
With Auto Trans, Add0.40.2
With Turbocharger, Add0.80.5
Both Banks
Note
With Ac, Add0.50.3
With Auto Trans, Add0.40.2
With Ps, Add0.50.3
With Turbocharger, Add0.80.5
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew3.20.0BAdd The Following Operations If Performed Along With Piston Or Ring Operations.
Crankshaft, Renew3.20.0BAdd The Following Operations If Performed Along With Piston Or Ring Operations.
Oil Pump, Renew0.90.0BAdd The Following Operations If Performed Along With Piston Or Ring Operations.
Oil Pump Screen, Clean0.20.0BAdd The Following Operations If Performed Along With Piston Or Ring Operations.
Timing Belt, Renew0.90.0BAdd The Following Operations If Performed Along With Piston Or Ring Operations.
Tune-Up0.50.0BSee Valves, Grind Head Removed And Combinations.
One
Note
With Ac, Add0.50.3B
With Ps, Add0.50.3B
With Auto Trans, Add0.40.2B
With Turbocharger, Add0.80.5B