Operation CHARM: Car repair manuals for everyone.

Batteries

TO GUARANTEE ADEQUATE BATTERY CONDITION AT VEHICLE DISPATCH, IN-PLANT PROCESSES HAVE BEEN REVIEWED RESULTING IN THE

IMPLEMENTATION OF A SLAVE BATTERY SYSTEM AND THE FITMENT OF

A NEW FULLY CHARGED BATTERY AT THE POINT OF DISPATCH. IN

ORDER THAT THE BATTERY CONDITION IS MAINTAINED DURING THE

TRANSIT PERIOD, ENSURING A GOOD STATE OF CHARGE AT PORT OF

ENTRY, IT IS ESSENTIAL THAT THE BATTERY QUIESCENT DRAIN IS

KEPT TO A MINIMUM. TO ACHIEVE THIS, IT HAS BEEN NECESSARY

TO REMOVE CERTAIN FUSES AND DISCONNECT THE MAIN VEHICLE

MICROPROCESSOR POWER SUPPLY. THE FUSES REMOVED ARE #10 (20 AMP) AND #6 (20 AMP) - RIGHTHAND "A" POST FUSEBOX AND #2 (3 AMP) AND #6 (3 AMP) - LEFTHAND "A" POST FUSEBOX. REMOVED

FUSES WILL BE PLACED IN A PLASTIC BAG AND STORED IN THE

FASCIA GLOVEBOX. THE MAIN VEHICLE MICROPROCESSOR POWER

SUPPLY WILL BE DISABLED BY DISCONNECTION OF Pm 4 CONNECTOR

RB/LB 12, SITUATED ADJACENT TO THE MICROPROCESSOR. THE
LOWER TRIM PANEL WHICH IS REMOVED TO GAIN ACCESS TO RB/LB 12

WILL BE STOWED IN THE TRUNK COMPARTMENT. PLEASE NOTE, THE

DISCONNECTION OF THE POWER SUPPLY TO THE MAIN MICROPROCESSOR

DOES NOT EFFECT THE MOBILITY OF THE VEHICLE. ALL DISPLACED

ITEMS ARE TO BE REFITTED/CONNECTED DURING VEHICLE P.D.I.