Rear
INSTALLATION
1. Install the cradle and install the rail bolts (4).
2. Align the cradle to the marks made previously.
3. Tighten the bolts (4) to 108 Nm (80 ft. lbs.).
4. Install the side cradle bolt (1).
5. Tighten the bolt (1) to 108 Nm (80 ft. lbs.).
6. Install the upper cradle bolts (2).
7. Tighten the bolts (2) to 102 Nm (75 ft. lbs.).
8. Connect the exhaust hangers (1 and 2).
9. Attach the track bar (1) and install the outer bolt (3) and nut (2).
10. Tighten the bolt (3) to 190 Nm (140 ft. lbs.).
11. Verify that the fuel filler tube grommet is in place and lube the grommet to aid installation of the filler tube.
12. Install the filler tube through the grommet.
13. Install the bolt (1) supporting the fuel filler tube (2) and tighten to 14 Nm (10 ft. lbs.).
14. Connect the fuel filler hose (3) to the fuel tank and install the clamp (4).
15. Connect the fuel line (1).
16. Connect the vapor canister line (2).
17. Connect the trailer wiring electrical connector (1).
18. Position the left wire harness through the cradle and secure the harness hangers.
19. Install the vapor canister (1) and install the lower canister nut (2).
20. Tighten the nuts to 24 Nm (17 ft. lbs.).
21. Connect the vapor canister hoses.
22. Connect the vapor canister electrical connector.
23. Position the right wire harness through the cradle and secure the harness hangers.
24. Connect the tire pressure monitor sensor, if equipped.
25. Install the fascia.
26. Install the spare wheel.