Operation CHARM: Car repair manuals for everyone.

Installation






INSTALLATION




1. Add MOPAR(R) Gasket Maker, Loctite(R) 518, or equivalent around inside of all holes and on mating flange.




2. Install the shift lever assembly (1) into the transmission case (2).




3. Install thenew bolts (1) holding the shift lever assembly (2) to the transmission and tighten to 19 Nm (168 in. lbs.)




4. Install new shift tower lock ball for shift detent (5) and tighten to 29 Nm (277 in. lbs.).
5. Install new shift lock ball for the select detent (3) and tighten to 39 Nm (345 in. lbs.).
6. Install new shift tower shift guide pin (2) and tighten to 30 Nm (277 in. lbs.).





CAUTION: Be sure to verify bracket position after installation.

7. Install the nut (4) holding the crossover rod (2) to the shift lever. Be sure to use a wrench (1) to hold the ball stud to prevent it from rotating in the shift lever tighten to 12 Nm (106 in. lbs.).