Installation
INSTALLATION
1. Clean the surfaces of the flywheel and pressure plate to make certain that all oil, grease, and rust have been removed.
2. Install and torque the flywheel-to-crankshaft bolts to 95 Nm (70 ft.lbs.).
3. Install clutch pressure plate and disc.
4. Install transaxle assembly.