Installation
INSTALLATION
1. Install the check strap.
2. Install the nuts and tighten to 10 Nm (85 in. lbs.).
3. Reposition the waterdam.
4. Install the trim panel. Refer to Trim Panel.
5. Install the bolts attaching the check strap to the D-pillar and tighten to 11 Nm (8 ft. lbs.).
6. Install the quarter trim panel. Refer to Trim Panel.