Power Top Control Module - Installation
INSTALLATION
1. Position the module (2) onto the power full open retractable roof assembly.
2. Install the two mounting screws (1).
3. Connect the electrical connectors (3).
4. Install the headliner, Headliner - Installation.
5. Connect the battery negative cable.
6. Re-initialize roof assembly, .