Left Side
LEFT SIDE
NOTE: All torques should be done with vehicle on the ground with full vehicle weight.
1. Position the upper suspension arm (2) in the frame rail bracket.
2. Install the mounting bolt and nut (1) Tighten to 95 Nm (70 ft. lbs.). with full vehicle weight.
3. Position the upper suspension arm in the axle bracket.
4. Install the mounting bolt and nut. Tighten to 115 Nm (85 ft. lbs.). with full vehicle weight.
5. Raise the fuel tank back into place and secure Fuel Tank - Installation.
6. Remove the supports and lower the vehicle.