Instrument Panel Demister Duct - Installation
INSTALLATION
NOTE: Right side duct shown. Left side similar.
1. Position each demister duct (2) onto the top of the instrument panel support (4).
2. Connect each demister duct to the defroster duct (1). Make sure the ducts are fully engaged to each other.
3. Install the two screws (3) that secure each demister duct to the instrument panel support. Tighten the screws to 1.2 Nm (10 in. lbs.).
4. Install the instrument panel cover Instrument Panel Cover - Installation.
5. Install the instrument panel Instrument Panel - Installation.