Installation
INSTALLATION - 5.7L
1. Install a new short runner valve actuator rubber O-ring seal (1).
2. Position the short runner valve actuator, install the retaining bolts (1) and tighten to 5 Nm (44 in. lb.).
3. Install the intake manifold and throttle body as an assembly Intake Manifold - Installation.
4. Connect the negative battery cable (1).