Operation CHARM: Car repair manuals for everyone.

Preparing For the 5LB SSC

PREPARING FOR THE SSC

Overview

Lexus is initiating a Special Service Campaign (SSC). The 5LB SSC is for certain 1998 through early 2005 model year LX 470 vehicles. The Daytime Running Lights (DRL) on certain 1998 through early 2005 model year LX 470 vehicles exceed luminous intensity requirements of the DRL under the Federal Motor Vehicle Safety Standards (FMVSS 108).

5LB Repair

The SSC 5LB involves inspecting the vehicle and installing a DRL resistor if necessary.

Customer Notification

Notification letters will be sent to the owners of affected vehicles beginning in June 2005. This letter will advise owners of the need to have the dealer inspect the vehicle and install a DRL resistor if necessary.

Identifying Affected Vehicles





The 5LB Special Service Campaign only applies to specific 1998 through early 2005 model year LX 470 vehicles within the VIN ranges shown. Not all vehicles in the VIN ranges are involved in this SSC. No other vehicles before or after this range are to be repaired under the provisions of this SSC.

NOTE:
Always consult Dealer Daily or TIS to confirm VIN eligibility and to assure the SSC is applicable. This will verify the vehicle is involved and has not already been completed by another dealer. TMS warranty will not reimburse dealers for repairs conducted on vehicles that are not affected.

Tools and Equipment

The following tools and equipment are needed for the repair.

^ Standard hand tools

^ Double Locking Pick Tool (P/N 00002-217958)

Technical Training

We suggest that all service department staff who will be directly involved in completing the repair or supporting the SSC should review the repair procedures to prepare for this SSC.





Parts

You are encouraged to order only those parts needed to repair vehicles with service appointments. Individual dealer tracking will be done and irregularities in quantity ordering will be passed on to Lexus Area Offices for follow-up and correction. There will be sufficient inventory to accommodate this SSC.











Planning Your Communication Strategy