Operation CHARM: Car repair manuals for everyone.

Removal








3MZ-FE ENGINE CONTROL SYSTEM: CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY:

REMOVAL

1. REMOVE ENGINE ROOM SIDE LH COVER NO.2 Removal

2. REMOVE ENGINE ROOM COVER SIDE Removal

3. REMOVE COOL AIR INTAKE DUCT SEAL Removal

4. REMOVE AIR CLEANER CAP W/ INLET Removal

5. REMOVE AIR CLEANER CASE W/ RESONATOR Removal

6. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 1)






(a) Disconnect the oil control valve connector.
(b) Remove the bolt and oil control valve.
7. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 2)






(a) Disconnect the oil control valve connector.
(b) Remove the bolt and oil control valve.