Operation CHARM: Car repair manuals for everyone.

Up to 08/2009





THEFT DETERRENT / KEYLESS ENTRY: SMART ACCESS SYSTEM WITH PUSH-BUTTON START (for Start Function): B2271: Ignition Hold Monitor Malfunction
B2271 - Ignition Hold Monitor Malfunction

DESCRIPTION

This DTC is stored when a problem such as an open in the AM2 fuse, an open or short in the wire harness between the fuse and power management control ECU, a short in the IG output circuit inside the power management control ECU, a short between the power management control ECU and relay, or a short in the relay is detected.





WIRING DIAGRAM





INSPECTION PROCEDURE

NOTICE:
* When the power management control ECU is replaced with a new one and the cable from the negative (-) battery terminal is connected, the power source mode becomes the on (IG) mode. When the battery is removed and reinstalled, the power source mode that was selected when the battery was removed is restored.
* Inspect the fuses for circuits related to this system before performing the following inspection procedure.
PROCEDURE

1. CHECK HARNESS AND CONNECTOR (BATTERY - POWER MANAGEMENT CONTROL ECU)

(a) Disconnect the F8 connector from the power management control ECU.





(b) Measure the voltage according to the value(s) in the table below.

Standard Voltage:





Text in Illustration





NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR (BATTERY - POWER MANAGEMENT CONTROL ECU)
OK -- Continue to next step.

2. CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - BODY GROUND)

(a) Disconnect the F8 connector from the power management control ECU.





(b) Measure the resistance according to the value(s) in the table below.

Standard Resistance:





Text in Illustration





NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR (POWER MANAGEMENT CONTROL ECU - BODY GROUND)
OK -- Continue to next step.

3. INSPECT IG1 RELAY

(a) Remove the IG1 relay from the engine room relay block assembly.





(b) Measure the resistance according to the value(s) in the table below.

Standard Resistance:





NG -- REPLACE IG1 RELAY
OK -- Continue to next step.

4. INSPECT IG2 RELAY

(a) Remove the IG2 relay from the engine room relay block assembly.





(b) Measure the resistance according to the value(s) in the table below.

Standard Resistance:





NG -- REPLACE IG2 RELAY
OK -- Continue to next step.

5. INSPECT INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY (IG NO. 1, IG NO. 2 AND IG NO. 3 RELAY)

(a) Remove the instrument panel junction block assembly Removal.





(b) Measure the resistance according to the value(s) in the table below.

Standard Resistance:





Text in Illustration





NG -- REPLACE INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY
OK -- Continue to next step.

6. CHECK HARNESS AND CONNECTOR

(a) Measure the resistance according to the value(s) in the table below.





Standard Resistance:





Text in Illustration





NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- Continue to next step.

7. CHECK HARNESS AND CONNECTOR (INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY - BODY GROUND)

(a) Measure the resistance according to the value(s) in the table below.





Standard Resistance:





Text in Illustration





NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR (INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY - BODY GROUND)
OK -- Continue to next step.

8. CHECK HARNESS AND CONNECTOR (INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY - IG1 RELAY)

(a) Measure the resistance according to the value(s) in the table below.





Standard Resistance:





Text in Illustration





NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR (INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY - IG1 RELAY)
OK -- Continue to next step.

9. CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - IG2 RELAY)

(a) Disconnect the F7 connector.





(b) Measure the resistance according to the value(s) in the table below.

Standard Resistance:





Text in Illustration





NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR (POWER MANAGEMENT CONTROL ECU - IG2 RELAY)
OK -- Continue to next step.

10. CHECK HARNESS AND CONNECTOR (ENGINE ROOM RELAY BLOCK ASSEMBLY - BODY GROUND)

(a) Measure the resistance according to the value(s) in the table below.





Standard Resistance:





Text in Illustration





NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR (ENGINE ROOM RELAY BLOCK ASSEMBLY - BODY GROUND)
OK -- Continue to next step.

11. CHECK POWER MANAGEMENT CONTROL ECU

(a) Install the instrument panel junction block assembly Installation.





(b) Reconnect the F7 and F8 connectors.

(c) Measure the voltage according to the value(s) in the table below.

Standard Voltage:





Text in Illustration





NG -- REPLACE POWER MANAGEMENT CONTROL ECU Removal

OK -- USE SIMULATION METHOD TO CHECK How To Proceed With Troubleshooting