Operation CHARM: Car repair manuals for everyone.

From 08/2009





2GR-FE ENGINE CONTROL: VACUUM SWITCHING VALVE (for Engine Mounting): REMOVAL

1. PRECAUTION (w/ Air Suspension)

NOTICE:
Be sure to read Precaution thoroughly before servicing Suspension Control System.

2. PRECAUTION (w/ Navigation System for HDD)

NOTICE:
After the engine switch is turned off, the display and navigation module display (HDD navigation system) records various types of memory and settings. As a result, after turning the engine switch off, make sure to wait at least 60 seconds before disconnecting the cable from the negative (-) battery terminal.

3. REMOVE ENGINE ROOM SIDE COVER Removal

4. REMOVE ENGINE ROOM SIDE COVER LH Removal

5. REMOVE COOL AIR INTAKE DUCT SEAL Removal

6. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL

CAUTION:
Wait at least 90 seconds after disconnecting the cable from the negative (-) battery terminal to disable the SRS system Service Precautions.

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.

7. REMOVE V-BANK COVER SUB-ASSEMBLY Removal

8. REMOVE BATTERY Removal

9. REMOVE NO. 2 AIR CLEANER INLET Removal

10. REMOVE NO. 1 AIR CLEANER INLET Removal

11. REMOVE NO. 1 ENGINE UNDER COVER

12. REMOVE DUTY VACUUM SWITCHING VALVE

(a) Disconnect the 3 vacuum hoses and separate the 2 vacuum hoses from the hose clamp.





(b) Disconnect the duty vacuum switching valve connector and the clamp.





(c) Remove the bolt.





(d) Disconnect the hose from the duty vacuum switching valve and remove the duty vacuum switching valve.