Up to 08/2009
2GR-FE ENGINE CONTROL: ACTIVE CONTROL ENGINE MOUNT: INSTALLATION
1. INSTALL FRONT ENGINE MOUNTING INSULATOR ASSEMBLY
(a) Install the front engine mounting insulator assembly with the 3 nuts and cap.
Torque : 52 Nm (530 kgf-cm, 38 ft-lbf)
Text in Illustration
(b) Connect the duty vacuum switching valve connector and clamp.
(c) Connect the 2 vacuum hoses.
2. INSTALL TRANSVERSE ENGINE MOUNTING BRACKET
(a) Install the transverse engine mounting bracket with the 3 bolts and nut.
Torque : 64 Nm (653 kgf-cm, 47 ft-lb for the nut)
Torque : 87 Nm (887 kgf-cm, 64 ft-lb for the bolt A)
Torque : 64 Nm (653 kgf-cm, 47 ft-lb for the bolt B)
3. INSTALL RADIATOR ASSEMBLY AND FAN ASSEMBLY WITH MOTOR
(a) Install the radiator assembly and fan assembly with motor Installation.