Up to 08/2009
METER / GAUGE / DISPLAY: COMBINATION METER: INSTALLATION
1. INSTALL COMBINATION METER ASSEMBLY
(a) Connect each connector.
(b) Install the combination meter assembly with the 2 screws.
2. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL
(a) Engage the 4 clips and 2 guides.
(b) Install the No. 1 instrument cluster finish panel with the 2 clips and 2 screws.
3. INSTALL NO. 2 INSTRUMENT PANEL HOLE COVER Installation
4. INSTALL NO. 1 INSTRUMENT PANEL HOLE COVER Installation
5. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY Installation
6. INSTALL NO. 1 SWITCH HOLE BASE Installation
7. INSTALL INSTRUMENT PANEL GARNISH LH Installation
8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
* Make sure that the cable has been disconnected from the negative (-) battery terminal for at least 2 seconds before reconnecting the cable.
* Reset the auto tilt away function setting to the previous condition by changing the customize parameter Programming and Relearning.
* When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.
9. INSPECT SUSPENSION CONTROL SYSTEM (w/ Air Suspension)
(a) Inspect the suspension control system Test Mode Procedure.