Operation CHARM: Car repair manuals for everyone.

From 08/2009





POWER DISTRIBUTION: INTEGRATION RELAY: INSTALLATION

1. INSTALL ENGINE ROOM JUNCTION BLOCK ASSEMBLY

(a) Connect the 3 connectors.





(b) Engage the 2 claws to install the engine room junction block assembly as shown in the illustration.





2. INSTALL NO. 1 RELAY BLOCK COVER

(a) Engage the 4 claws to install the lower No. 1 relay block cover.





(b) Engage the 3 claws to install the upper No. 1 relay block cover.





3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.