Up to 08/2009
HYBRID / BATTERY CONTROL: BATTERY BLOWER: INSTALLATION
1. INSTALL BATTERY COOLING BLOWER ASSEMBLY
CAUTION:
Be sure to wear insulated gloves and protective goggles.
(a) Install the 3 battery cooling blower assemblies with the 9 nuts.
Torque : 7.5 Nm (76 kgf-cm, 66 in-lbf)
(b) Connect each battery cooling blower assembly connector and clamp.
2. HIGH VOLTAGE CABLE CONNECTION Installation
3. INSTALL BATTERY COVER SUB-ASSEMBLY
HINT
Installation.
4. INSTALL SERVICE PLUG GRIP Installation
5. INSTALL BATTERY SERVICE HOLE COVER Installation
6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.