Operation CHARM: Car repair manuals for everyone.

Up to 08/2009





HYBRID / BATTERY CONTROL: BATTERY BLOWER: INSTALLATION

1. INSTALL BATTERY COOLING BLOWER ASSEMBLY

CAUTION:
Be sure to wear insulated gloves and protective goggles.

(a) Install the 3 battery cooling blower assemblies with the 9 nuts.





Torque : 7.5 Nm (76 kgf-cm, 66 in-lbf)

(b) Connect each battery cooling blower assembly connector and clamp.





2. HIGH VOLTAGE CABLE CONNECTION Installation

3. INSTALL BATTERY COVER SUB-ASSEMBLY

HINT
Installation.

4. INSTALL SERVICE PLUG GRIP Installation

5. INSTALL BATTERY SERVICE HOLE COVER Installation

6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.