From 08/2009
2GR-FXE BATTERY / CHARGING: BATTERY: INSTALLATION
1. INSTALL AUXILIARY BATTERY
(a) Install the battery.
(b) Install the battery insulator.
(c) Connect the battery ventilation hose to the battery without kinking it.
HINT
Push in the battery ventilation hose to the battery until a click sound is heard.
(d) Install the battery clamp with the bolt and nut.
Nut - Torque : 5.4 Nm (55 kgf-cm, 48 in-lbf)
Bolt - Torque : 5.4 Nm (55 kgf-cm, 48 in-lbf)
(e) Install the positive (+) battery terminal with the nut.
Torque : 6.4 Nm (65 kgf-cm, 57 in-lbf)
(f) Install the battery terminal cap.
2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.
3. INSTALL REAR FLOOR FINISH PLATE Installation
4. INSTALL REAR DECK FLOOR BOX Installation
5. INSTALL SPARE WHEEL COVER ASSEMBLY (for Compact Spare Tire) Installation