Installation
1UR-FE ENGINE CONTROL: CAMSHAFT OIL CONTROL VALVE: INSTALLATION
1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 1)
(a) Apply a light coat of engine oil to a new O-ring.
(b) Install the O-ring to the camshaft timing oil control valve.
(c) Install the camshaft timing oil control valve with the bolt.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(d) Connect the camshaft timing oil control valve connector.
2. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Intake Side of Bank 1)
(a) Apply a light coat of engine oil to a new O-ring.
(b) Install the O-ring to the camshaft timing oil control valve.
(c) Install the camshaft timing oil control valve with the bolt.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(d) Connect the camshaft timing oil control valve connector.
3. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Intake Side of Bank 2)
(a) Apply a light coat of engine oil to a new O-ring.
(b) Install the O-ring to the camshaft timing oil control valve.
(c) Install the camshaft timing oil control valve with the bolt.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(d) Connect the camshaft timing oil control valve connector.
4. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 2)
(a) Apply a light coat of engine oil to a new O-ring.
(b) Install the O-ring to the camshaft timing oil control valve.
(c) Install the camshaft timing oil control valve with the bolt.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(d) Connect the camshaft timing oil control valve connector.
5. INSTALL AIR CLEANER CAP AND HOSE Installation
6. INSTALL V-BANK COVER SUB-ASSEMBLY Installation