Installation
1UR-FE ENGINE CONTROL: IGNITION COIL AND SPARK PLUG: INSTALLATION
1. INSTALL SPARK PLUG
(a) Using a 16 mm plug wrench, install the 8 spark plugs.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
2. INSTALL IGNITION COIL ASSEMBLY
(a) for Bank 1:
Install the 4 ignition coils.
(1) Install the 4 ignition coils with the 4 bolts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(2) Connect the 4 ignition coil connectors.
(3) Attach the clamp and connect the engine wire.
(b) for Bank 2:
Install the 4 ignition coils.
(1) Install the 4 ignition coils with the 4 bolts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(2) Connect the 4 ignition coil connectors.
(3) Attach the 2 clamps and connect the engine wire.
(4) Connect the No. 4 water by-pass pipe with the 2 bolts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(5) Attach the clamp and connect the engine wire.
3. INSTALL AIR CLEANER CASE SUB-ASSEMBLY Installation
4. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY
5. INSTALL AIR CLEANER CAP AND HOSE Installation
6. INSTALL V-BANK COVER SUB-ASSEMBLY Installation