Operation CHARM: Car repair manuals for everyone.

PS Warning Light Remains ON





POWER ASSIST SYSTEMS: POWER STEERING SYSTEM: PS Warning Light Remains ON
- PS Warning Light Remains ON

DESCRIPTION

If the power steering ECU detects a malfunction, the P/S warning light comes on. At this time, the power steering ECU stores a DTC in its memory.

WIRING DIAGRAM





INSPECTION PROCEDURE

NOTICE:
If the power steering ECU has been replaced with a new one, perform the rotation angle sensor initialization and torque sensor zero point calibration ( Programming and Relearning).

PROCEDURE

1. CHECK HARNESS AND CONNECTOR

(a) Turn the power switch on (IG).

(b) Check the indication condition of the P/S warning light by wiggling the power steering ECU connector and wire harness up and down, and right and left.

OK:

P/S warning light indication condition does not change.

NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- Continue to next step.

2. CHECK FOR DTC (CAN COMMUNICATION SYSTEM)

(a) Using the Techstream, check for DTCs and confirm that there are no problems in the CAN communication system Diagnosis System.

Result:





B -- GO TO CAN COMMUNICATION SYSTEM How to Proceed With Troubleshooting
A -- Continue to next step.

3. READ VALUE USING TECHSTREAM (IG POWER SUPPLY)

(a) Turn the power switch off.

(b) Connect the Techstream to the DLC3.

(c) Turn the power switch on (IG).

(d) Turn the Techstream on.

(e) Enter the following menus: Chassis / EMPS / Data List.

(f) Select the item "IG Power Supply" in the Data List and read the value displayed on the Techstream.

EMPS





OK:

The normal condition value is displayed on the Techstream.

NG -- CHECK HARNESS AND CONNECTOR (POWER STEERING ECU - BODY GROUND)

OK -- REPLACE POWER STEERING ECU Removal

4. CHECK HARNESS AND CONNECTOR (POWER STEERING ECU - BODY GROUND)

(a) Disconnect the connectors from the power steering ECU.





(b) Measure the voltage according to the value(s) in the table below.

Standard Voltage:





(c) Measure the resistance according to the value(s) in the table below.

Standard Resistance:





Text in Illustration





NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- Continue to next step.

5. PERFORM ACTIVE TEST USING TECHSTREAM (COMBINATION METER)

(a) Turn the power switch off.

(b) Connect the Techstream to the DLC3.

(c) Turn the power switch on (IG).

(d) Turn the Techstream on.

(e) Enter the following menus: Body Electrical / Combination Meter / Active Test.

(f) Perform the Active Test of the combination meter using the Techstream.

Combination Meter





(g) Check that the P/S warnings light operates in accordance with the Active Test.

OK:

The P/S warning light turns on or off in accordance with the Techstream operation.

NG -- REPLACE COMBINATION METER ASSEMBLY Removal

OK -- REPLACE POWER STEERING ECU Removal