Bank 1 and 2 Sensor 1
INSPECTION
INSPECT HEATER RESISTANCE OF HEATED OXYGEN SENSORS (BANK 1, 2 SENSOR 1 AND BANK 1 SENSOR 2)
(a) Disconnect the oxygen sensor connectors.
Bank 1 Sensor 1, 2:
Bank 2 Sensor 1:
(b) Using an ohmmeter, measure the resistance between the terminals +B and HT.
Resistance: 11 - 16 Ohms at 20°C (68°F)
If the resistance is not as specified, replace the sensor.
Torque: 45 N.m (450 kgf.cm, 33 ft.lbf)
(c) Reconnect the oxygen sensor connectors.