Valve Body
DISASSEMBLY
NOTICE:
- Disassembling and reassembling should be conducted on a clean vinyl sheet or mat, or aluminum tray.
- Make the valve slide through the valve hole by its own weight. Do not forcibly pull out the valve using needle nose pliers. When having difficulty in removing it, slant and shake the valve body or use a magnet hand.
- Do not place the disassembled parts directly on metal work bench or waste cloth.
- Do not use dropped parts.
- Make sure that no burr is identified before assembling.
1. CHECK PRIMARY REGULATOR VALVE POSITION
Write down the relative position of the primary regulator valve sleeve, the plug and the pin.
NOTICE: Because the line pressure is changed by the position of the pin and the groove in the sleeve end, make sure to check the position.
2. REMOVE SHIFT SOLENOID VALVE
a. Remove the 5 bolts and 5 shift solenoid valves.
3. REMOVE LOWER VALVE BODY
a. Remove the 8 bolts.
b. Remove the 7 bolts, cover and gasket.
c. Remove the bolt, cover and 2 pressure relief balls.
d. Using snap ring pliers, remove the 2 snap rings.
e. Remove 4 springs from the valve body.
f. Remove 2 pistons from the valve body.
g. Remove the 7 bolts from lower value body.
h. Remove lower value body with plate from the upper value body.
NOTICE: Be careful that the check balls do not fall out.
i. Turn over the lower valve body with plate.
j. Remove the plate from lower valve body.
NOTICE: Be careful that the check balls do not fall out.
REASSEMBLY
1. ASSEMBLE VALVE BODY
a. Install the check balls to the upper and lower valve body.
b. Install the plate to the lower valve body.
c. Install the lower valve body with plate to the upper valve body.
d. Install the 7 bolts to the lower valve body.
Torque: 11 Nm (110 kgf-cm, 8 ft. lbs.)
Bolt length: 41 mm (1.614 inch)
2. INSTALL ACCUMULATOR
a. Install 2 accumulator valves to the valve body.
b. Install 4 springs to the valve body.
Spring length
c. Using snap ring pliers, install the snap ring.
d. Install a check ball, a retainer and a bolt to the upper valve body.
Torque: 11 Nm (110 kgf-cm, 8 ft. lbs.)
e. Turn over the valve body.
f. Install the 14 bolts, gasket and upper body cover.
Torque:
Bolt A: 11 Nm (110 kgf-cm, 8 ft. lbs.)
Bolt B: 11 Nm (110 kgf-cm, 8 ft. lbs.)
Bolt C: 6.6 Nm (67 kgf-cm, 58 inch lbs.)
Bolt D: 6.6 Nm (67 kgf-cm, 58 inch lbs.)
HINT: Each bolts length is indicated below.
Bolt A: 41 mm (1.614 inch)
Bolt B: 30 mm (1.181 inch)
Bolt C: 15 mm (0.591 inch)
Bolt D: 10 mm (0.394 inch)
3. INSTALL SHIFT SOLENOID VALVE
Install the 5 shift solenoid valves with 5 bolts.
Torque:
Bolt A: 11 Nm (110 kgf-cm, 8 ft. lbs.)
Bolt B: 6.6 Nm (67 kgf-cm, 58 inch lbs.)
Bolt length:
Bolt A: 45 mm (1.77 inch)
Bolt B: 12 mm (0.45 inch)
4. CHECK PRIMARY REGULATOR VALVE POSITION
Make sure that the primary regulator valve is positioned in the same place where it was removed.