Operation CHARM: Car repair manuals for everyone.

Fuel Injector: Service and Repair

Fuel Injector Assy:






REPLACEMENT

1. WORK FOR PREVENTING GASOLINE FROM SPILLING OUT

2. DRAIN COOLANT

3. REMOVE V-BANK COVER SUB-ASSY

4. REMOVE BATTERY

5. REMOVE AIR CLEANER ASSEMBLY WITH HOSE

6. REMOVE FRONT SUSPENSION UPPER BRACE CENTER (W/ FRONT SUSPENSION BRACE UPPER CENTER)

7. REMOVE INTAKE AIR SURGE TANK




8. SEPARATE FUEL PIPE SUB-ASSY NO.1
a. Remove the pulsation damper and 2 gaskets.
b. Remove the bolt and 2 gaskets.
c. Remove the bolt and disconnect the fuel pipe sub-assembly No.1 from the intake manifold.

9. REMOVE FUEL INJECTOR ASSY
a. Disconnect the injector connectors.
b. Remove the 2 bolts and fuel delivery pipe, while pulling out both ends of the fuel delivery pipe equally.
c. While turning the injector clockwise and counterclockwise, pull out the injector from the delivery pipe.




10. INSTALL FUEL INJECTOR ASSY
a. Apply a light coat of gasoline to a new O-ring and install them to each injectors.
b. While turning the injector clockwise and counterclockwise, install it to the delivery pipe.
c. Check that the injectors rotate smoothly.

NOTE: If injectors do not rotate smoothly, the probable cause is incorrect installation of the O-rings. Replace new O-rings.

d. Install the delivery pipe with the injectors.

Torque: 10 N.m (102 kgf.cm, 7 ft.lbf)

NOTE:
- Be careful not to drop the injectors when installing the delivery pipe.
- Check that the injectors rotate smoothly after installing the delivery pipe.




11. INSTALL FUEL PIPE SUB-ASSY NO.1
a. Install the fuel pipe No.1 with the 2 new pulsation damper gaskets and the pulsation damper.

Torque: 33 N.m (336 kgf.cm, 24 ft.lbf)

b. Install the delivery pipe with 2 new fuel pipe No.1 gaskets and a bolt to the fuel pipe No.1.

Torque: 33 N.m (336 kgf.cm, 24 ft.lbf)

c. Install the fuel pipe No.1 to the intake manifold with a bolt.

Torque: 20 N.m (199 kgf.cm. 14 ft.lbf)

12. INSTALL INTAKE AIR SURGE TANK

13. INSTALL FRONT SUSPENSION UPPER BRACE CENTER (W/ FRONT SUSPENSION BRACE UPPER CENTER)

Torque: 80 N.m (816 kgf.cm, 59 ft.lbf)

14. INSTALL AIR CLEANER ASSEMBLY WITH HOSE

15. INSTALL V-BANK COVER SUB-ASSY

16. ADD COOLANT

17. CHECK ENGINE COOLANT LEAK

18. INSPECT FUEL LEAK