Operation CHARM: Car repair manuals for everyone.

Component Tests and General Diagnostics

SLIDING ROOF

ON-VEHICLE INSPECTION

INSPECT SLIDING ROOF GLASS ALIGNMENT





a. Start the engine and check the operation time of the sliding roof.

Operation time:
Approx. 6 sees
.

b. Check for abnormal noise or binding during operation.
c. With the sliding roof fully closed, check for water leakage.
d. Check for a difference in level between the sliding roof weatherstrip and roof panel.

Front end:
-1.5 mm (-0.059 in.)
+0.5 mm (+0.020 in.)


Side end:
± 1.0 mm (± 0.039 in.)


Rear end:
-0.5 mm (-0.020 in.)
+1.5 mm (+0.059 in.)