Operation CHARM: Car repair manuals for everyone.

Accessory Control Display: Service and Repair

Multi-Display (w/Navigation System):




MULTI-DISPLAY (w/ Navigation System)

REMOVAL

1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL

CAUTION: Wait at least 90 seconds after disconnecting the cable from the negative (-) battery terminal to prevent airbag and seat belt pretensioner activation.

2. REMOVE AIR CONDITIONING CONTROL ASSEMBLY
3. REMOVE INSTRUMENT PANEL SAFETY PAD GARNISH SUB-ASSEMBLY
4. REMOVE NO.2 INSTRUMENT PANEL GARNISH SUB-ASSEMBLY




5. REMOVE INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY CENTER
a. Remove the 2 bolts and 2 screws.
b. Disconnect the connector. Then remove the multidisplay (with panel) and clip.




6. REMOVE MULTI-DISPLAY (CENTER DISPLAY)
a. Remove the 4 screws on the both sides of the instrument panel finish upper panel.




b. Remove the 6 screws and instrument panel finish panel No.1 retainer.




c. Remove the 5 screws and instrument panel finish panel No.2 retainer.
d. Remove the instrument cluster finish center lower panel.




e. Remove the 2 screws.




f. Remove the 2 screws and wiring harness clamp.
g. Disconnect the 4 connectors, then remove the clamp.
h. Remove the multi-display.

INSTALLATION




1. INSTALL MULTI-DISPLAY (CENTER DISPLAY)
a. Install the multi-display.
b. Connect the 4 connectors and install the clamp.
c. Install the harness clamp with the 2 screws.




d. Install the 2 screws.




e. Install the No.2 retainer with the 5 screws.




f. Install the No.1 retainer with the 6 screws.




g. Install the instrument panel finish upper panel with the 4 screws to the both sides.




2. INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY CENTER
a. Connect the connector and detach the clip.
b. Install the panel with the 2 bolts and 2 screws.

3. INSTALL NO.2 INSTRUMENT PANEL GARNISH SUB-ASSEMBLY
4. INSTALL INSTRUMENT PANEL SAFETY PAD GARNISH SUB-ASSEMBLY
5. INSTALL AIR CONDITIONING CONTROL ASSEMBLY
6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

7. PERFORM INITIALIZATION
a. Perform initialization. Testing and Inspection

NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.

8. CHECK SRS WARNING LIGHT