Installation
HORN: HIGH PITCHED HORN: INSTALLATION
INSTALLATION
1. INSTALL HIGH PITCHED HORN ASSEMBLY
(a) Connect the horn connector.
(b) Install the horn with the bolt.
Torque: 19 Nm (194 kgf-cm, 14 ft-lbf)
2. INSTALL COOL AIR INTAKE DUCT SEAL Installation
3. INSTALL INLET AIR CLEANER COVER SUB-ASSEMBLY Installation
4. INSTALL ENGINE ROOM SIDE COVER LH Installation
5. INSTALL ENGINE ROOM SIDE COVER RH Installation