Installation
2GR-FE ENGINE CONTROL SYSTEM: KNOCK SENSOR:
INSTALLATION
1. INSTALL KNOCK CONTROL SENSOR
(a) Install the 2 knock control sensors with the 2 bolts as shown in the illustration.
Torque: 20 Nm (204 kgf-cm, 15 ft-lbf)
(b) Connect the 2 knock control sensor connectors.
2. INSTALL INTAKE MANIFOLD Installation
3. CONNECT FUEL TUBE SUB-ASSEMBLY Installation
4. INSTALL INTAKE AIR SURGE TANK Installation
5. INSTALL NO. 1 AIR CLEANER INLET Installation
6. INSTALL AIR CLEANER CASE SUB-ASSEMBLY Installation
7. INSTALL AIR CLEANER CAP SUB-ASSEMBLY Installation
8. INSTALL AIR CLEANER INLET ASSEMBLY Installation
9. ADD ENGINE COOLANT Testing and Inspection
10. CHECK FOR ENGINE COOLANT LEAKS Testing and Inspection
11. CHECK FOR FUEL LEAKS Testing and Inspection
12. INSTALL FRONT SUSPENSION UPPER CENTER BRACE Installation
13. INSTALL V-BANK COVER SUB-ASSEMBLY Installation
14. INSTALL ENGINE ROOM SIDE COVER LH Installation
15. INSTALL ENGINE ROOM SIDE COVER RH Installation
16. INSTALL COOL AIR INTAKE DUCT SEAL Installation
17. INSTALL ENGINE UNDER COVER RH
18. INSTALL ENGINE UNDER COVER LH