Installation
2GR-FE ENGINE CONTROL SYSTEM: ACCELERATION SENSOR:
INSTALLATION
1. INSTALL ACCELERATION SENSOR
(a) Install the acceleration sensor with the 2 nuts.
Torque: 8.0 Nm (82 kgf-cm, 71 in-lbf)
(b) Connect the acceleration sensor connector and clamp.
2. INSTALL NO. 1 AIR CLEANER INLET Installation
3. INSTALL AIR CLEANER INLET ASSEMBLY Installation
4. INSTALL V-BANK COVER SUB-ASSEMBLY Installation
5. INSTALL ENGINE ROOM SIDE COVER LH Installation
6. INSTALL COOL AIR INTAKE DUCT SEAL Installation
7. INSTALL ENGINE UNDER COVER RH
8. INSTALL ENGINE UNDER COVER LH
9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.