Operation CHARM: Car repair manuals for everyone.

Removal








2GR-FE ENGINE CONTROL SYSTEM: THROTTLE BODY:

REMOVAL

1. REMOVE ENGINE UNDER COVER LH
2. REMOVE ENGINE UNDER COVER RH
3. DRAIN ENGINE COOLANT Testing and Inspection
4. REMOVE COOL AIR INTAKE DUCT SEAL Removal
5. REMOVE ENGINE ROOM SIDE COVER LH Removal
6. REMOVE V-BANK COVER SUB-ASSEMBLY Removal
7. REMOVE AIR CLEANER INLET ASSEMBLY Removal
8. REMOVE AIR CLEANER CAP SUB-ASSEMBLY





(a) Disconnect the 2 vacuum hoses.





(b) Disconnect the mass air flow meter connector (*1).
(c) Disconnect the No. 2 ventilation hose (*2).
(d) Disconnect the hose band (*3).





(e) Disconnect the 3 bands, and remove the air cleaner cap sub-assembly.
9. REMOVE AIR CLEANER CASE SUB-ASSEMBLY Removal
10. REMOVE NO. 1 AIR CLEANER INLET Removal
11. REMOVE THROTTLE BODY





(a) Disconnect the throttle body connector and clamp.





(b) Disconnect the 2 water by-pass hoses from the throttle body.





(c) Remove the 4 bolts and throttle body.
(d) Remove the throttle body gasket from the intake air surge tank.