Removal
2GR-FE INTAKE: VACUUM SWITCHING VALVE:
REMOVAL
1. REMOVE COOL AIR INTAKE DUCT SEAL Removal
2. REMOVE ENGINE ROOM SIDE COVER LH Removal
3. REMOVE VACUUM SWITCHING VALVE
(a) Remove the 2 vacuum hoses and vacuum switching valve connector.
(b) Remove the screw and vacuum switching valve.