Operation CHARM: Car repair manuals for everyone.

Installation








HYBRID BATTERY CONTROL: BATTERY BLOWER: INSTALLATION

INSTALLATION

1. INSTALL BATTERY COOLING BLOWER ASSEMBLY





(a) Install the No. 3 HV battery intake duct to the battery cooling blower assembly.
NOTICE:
Be sure to engage the claws securely.





(b) Install the battery cooling blower assembly together with the No. 3 HV battery intake duct to the HV battery.
CAUTION:
Wear insulated gloves.
- Do not touch the fan of the battery cooling blower assembly.
- Do not hold the wire harness when lifting the battery cooling blower assembly.
- When installing the battery cooling blower assembly, slide the protrusion on the battery cooling blower assembly along the portion indicated by the arrow on the HV battery.
- Be sure to engage the cutout on the battery cooling blower assembly to the bushing securely.





(c) Connect the No. 3 HV battery intake duct to the No. 4 HV battery intake duct.
CAUTION:
Wear insulated gloves.
NOTICE:
Be sure to engage the duct claws securely.





(d) Install the 2 nuts and connector.
CAUTION:
Wear insulated gloves.

Torque: 8.0 Nm (82 kgf-cm, 71in-lbf)
2. INSTALL NO. 6 HV BATTERY INTAKE DUCT





(a) Install the No. 6 HV battery intake duct with the clip.
CAUTION:
Wear insulated gloves.

3. INSTALL NO. 2 HV BATTERY INTAKE DUCT





(a) Install the No. 2 HV battery intake duct with the 2 clips.
CAUTION:
Wear insulated gloves.

4. INSTALL LUGGAGE COMPARTMENT FRONT TRIM COVER Installation
5. INSTALL ROPE HOOK ASSEMBLY Installation
6. INSTALL TOOL BOX
7. INSTALL LUGGAGE COMPARTMENT INNER TRIM COVER RH
8. INSTALL BATTERY SERVICE HOLE COVER LH Installation
9. INSTALL LUGGAGE COMPARTMENT FLOOR MAT