Installation
2UR-FSE ENGINE CONTROL SYSTEM: VVT SENSOR: INSTALLATION
INSTALLATION
HINT: When viewed from the rear of the engine assembly, Bank 1 is on the left side and Bank 2 is on the right side.
1. INSTALL VVT SENSOR
(a) Install the 4 sensors with the 4 bolts.
Torque: 10 Nm (102 kgf-cm, 7ft-lbf)
(b) Connect the 4 sensor connectors.
2. INSTALL AIR CLEANER ASSEMBLY RH Installation
3. INSTALL AIR CLEANER ASSEMBLY LH Installation
4. INSTALL NO. 1 AIR CLEANER INLET Installation
5. INSTALL AIR CLEANER INLET COVER SUB-ASSEMBLY Installation
6. INSTALL V-BANK COVER SUB-ASSEMBLY Installation