Installation
CRUISE CONTROL: CRUISE CONTROL MAIN SWITCH: INSTALLATION
1. INSTALL CRUISE CONTROL MAIN SWITCH
(a) Install the switch with the 2 screws.
Torque : 1.7 to 3.0 Nm (17 to 31 kgf-cm, 15 to 27 in-lbf)
(b) Connect the connector.
2. INSTALL STEERING WHEEL ASSEMBLY
For 2GR-FSE Installation
For 1UR-FSE Installation
3. INSTALL STEERING WHEEL PAD Installation
4. INSTALL STEERING WHEEL NO. 3 COVER LOWER
5. INSTALL STEERING WHEEL NO. 2 COVER LOWER
6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
7. PERFORM INITIALIZATION
NOTICE:
Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
Perform initialization Repair Instruction - Initialization.
8. CHECK SRS WARNING LIGHT
Check the SRS warning light Diagnosis System.