Operation CHARM: Car repair manuals for everyone.

2AZ-FXE Engine Control





2AZ-FXE ENGINE CONTROL: INTEGRATION RELAY: INSTALLATION

1. INSTALL NO. 1 INTEGRATION RELAY

(a) Connect the 3 connectors.

(b) Attach the No. 1 integration relay to the engine room relay block.

2. INSTALL NO. 1 RELAY BLOCK COVER