Installation
2AZ-FXE STARTING: POWER SWITCH: INSTALLATION
1. INSTALL POWER SWITCH
(a) Attach the 2 claws to install the power switch.
2. INSTALL INSTRUMENT PANEL FINISH PANEL END LH Installation
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL Installation
4. INSTALL LUGGAGE COMPARTMENT FLOOR MAT
(a) Install the luggage compartment floor mat.