P0A85
HYBRID BATTERY CONTROL: HYBRID BATTERY SYSTEM: P0A85-123: Hybrid Battery Pack Cooling Fan 1
P0A85-123 - Hybrid Battery Pack Cooling Fan 1
DESCRIPTION
Refer to the description for DTC P0A84-123 P0A84.
WIRING DIAGRAM
Refer to the wiring diagram for DTC P0A84-123 P0A84, DTC P0A9D-123 P00C35 and DTC P0AAE-123 P0AAE.
INSPECTION PROCEDURE
CAUTION:
- Before inspecting the high-voltage system, take safety precautions such as wearing insulated gloves and removing the service plug grip to prevent electrical shocks. After removing the service plug grip, put it in your pocket to prevent other technicians from accidentally reconnecting it while you are working on the high-voltage system.
- After disconnecting the service plug grip, wait for at least 10 minutes before touching any of the high-voltage connectors or terminals. After waiting for 10 minutes, check the voltage at the terminals in the inspection point in the inverter with converter assembly. The voltage should be 0 V before beginning work.
HINT
Waiting for at least 10 minutes is required to discharge the high-voltage capacitor inside the inverter with converter assembly.
PROCEDURE
1. CHECK FOR DTCS (DTC P0A1F-123 IS OUTPUT)
(a) Connect the Techstream to the DLC3.
(b) Turn the power switch on (IG).
(c) Select the following menu items: Powertrain / Hybrid Control / Trouble Codes.
(d) Check if DTCs are output.
Result
B -- GO TO DTC CHART (P0A1F-123) Hybrid Battery System
A -- Continue to next step.
2. CHECK HARNESS AND CONNECTOR (VM0 VOLTAGE)
CAUTION:
Be sure to wear insulated gloves.
(a) Remove the HV battery Removal.
(b) Place the HV battery in the vehicle so that measurements can be made at the battery cooling blower assembly (for upper side) connector.
NOTICE:
Make sure all the covers are installed to the HV battery when placing it in the vehicle, and then remove the covers again after the HV battery is in place.
HINT
- Follow the installation procedures to the point where the HV battery is set in the vehicle Installation.
- Do not install the service plug grip.
(c) Reconnect all the connectors that were disconnected when the HV battery was removed.
(d) Turn the power switch on (IG).
(e) Using a service wire, connect terminals z76-3 (SI0) and z76-4 (GND0) of the battery cooling blower assembly (for upper side) connector.
(f) Measure the voltage according to the value(s) in the table below.
Standard Voltage:
HINT
- Perform this inspection with the battery cooling blower assembly (for upper side) connector connected.
- If the power switch is turned on (IG) with the service plug grip removed, DTC P0A0D-350 for the interlock switch system will be set. If this DTC is output, clear the DTC using the Techstream Hybrid Battery System.
NG -- CHECK HARNESS AND CONNECTOR (VM0 VOLTAGE)
OK -- Continue to next step.
3. CHECK HV BATTERY (BATTERY TEMPERATURE SENSOR AND INTAKE AIR TEMPERATURE SENSOR)
CAUTION:
Be sure to wear insulated gloves.
(a) Remove the HV battery Removal.
(b) Disconnect the z36 and z87 battery smart unit connectors.
HINT
For the removal and installation procedures related to the battery smart unit connector inspection, Removal.
(c) Measure the resistance according to the value(s) in the table below.
Standard Resistance (Battery temperature sensors):
Standard Resistance (Intake air temperature sensor):
NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- REPLACE BATTERY SMART UNIT Removal
4. CHECK HARNESS AND CONNECTOR (VM0 VOLTAGE)
CAUTION:
Be sure to wear insulated gloves.
(a) Disconnect the z76 battery cooling blower assembly (for upper side) connector.
(b) Turn the power switch on (IG).
(c) Measure the voltage according to the value(s) in the table below.
Standard Voltage:
HINT
- Turning the power switch on (IG) with the battery cooling blower assembly (for upper side) connector disconnected may cause DTC P0A84-123 (Hybrid Battery Pack Cooling Fan 1) to be set. Make sure to clear this code using the Techstream Hybrid Battery System.
- If the power switch is turned on (IG) with the service plug grip removed, DTC P0A0D-350 for the interlock switch system will be set. If this DTC is output, clear the DTC using the Techstream Hybrid Battery System.
NG -- CHECK HARNESS AND CONNECTOR (BATTERY SMART UNIT - BATTERY COOLING BLOWER ASSEMBLY [FOR UPPER SIDE])
OK -- REPLACE BATTERY COOLING BLOWER ASSEMBLY (for Upper Side) Removal
5. CHECK HARNESS AND CONNECTOR (BATTERY SMART UNIT - BATTERY COOLING BLOWER ASSEMBLY [FOR UPPER SIDE])
CAUTION:
Be sure to wear insulated gloves.
(a) Remove the HV battery Removal.
(b) Disconnect the z36 battery smart unit connector.
HINT
For the removal and installation procedures related to the battery smart unit connector inspection, Removal.
(c) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- REPLACE BATTERY SMART UNIT Removal