Installation
POWER STEERING: POWER STEERING ECU: INSTALLATION
1. INSTALL POWER STEERING ECU
(a) Attach the claw and install the ECU with the 4 bolts.
Torque : 8.5 Nm (87 kgf-cm, 75 in-lbf)
(b) Connect the connector C to the ECU.
(c) Connect the ECU connectors A and B and securely lock the connectors.
2. INSTALL NO. 1 INVERTER RESERVOIR BRACKET
(a) Install the bracket with the 2 bolts.
Torque : 13 Nm (133 kgf-cm, 10 ft-lbf)
(b) Install the reservoir with the 2 nuts.
Torque : 13 Nm (133 kgf-cm, 10 ft-lbf)
3. INSTALL AIR CLEANER ASSEMBLY RH Installation
4. INSTALL AIR CLEANER INLET COVER SUB-ASSEMBLY
(a) Install the inlet cover with the 5 clips.
5. INSTALL ENGINE ROOM SIDE COVER
(a) Install the side cover with the 4 clips.
6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.
7. INSTALL BATTERY SERVICE HOLE COVER LH Installation
8. INSTALL DECK TRIM SIDE BOARD LH (w/o Spare Tire) Installation
9. INSTALL LUGGAGE COMPARTMENT MAT SUB-ASSEMBLY Installation
10. PERFORM VARIABLE GEAR RATIO STEERING SYSTEM CALIBRATION
(a) Perform variable gear ratio steering system calibration Calibration.