Installation
STEERING COLUMN: STEERING CONTROL ECU: INSTALLATION
1. INSTALL STEERING CONTROL ECU
(a) Install the ECU with the 3 screws.
Torque : 5.5 Nm (56 kgf-cm, 49 in-lbf)
HINT
* Securely attach the hook (B) of the ECU to the blower.
* Align the positioning boss (A) of the blower with the hole of the ECU.
(b) Connect the 3 ECU connectors.
2. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY Installation
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.
4. INSTALL BATTERY SERVICE HOLE COVER LH Installation
5. INSTALL DECK TRIM SIDE BOARD LH (w/o Spare Tire) Installation
6. INSTALL LUGGAGE COMPARTMENT MAT SUB-ASSEMBLY Installation
7. CHECK SRS WARNING LIGHT
(a) Check the SRS warning light Diagnosis System.
8. PERFORM VARIABLE GEAR RATIO STEERING SYSTEM CALIBRATION
(a) Perform variable gear ratio steering system calibration Calibration.