Operation CHARM: Car repair manuals for everyone.

Installation





HYBRID / BATTERY CONTROL: BATTERY BLOWER: INSTALLATION

1. INSTALL BATTERY COOLING BLOWER ASSEMBLY

NOTICE:
* Be sure not to touch the fan part of the battery cooling blower assembly.
* Do not lift the battery cooling blower assembly using the wire harness.

(a) Install the battery cooling blower assembly with the 2 bolts and nut.

Torque : 7.5 Nm (76 kgf-cm, 66 in-lbf)

(b) Connect the battery cooling blower assembly connector and clamp.

(c) Connect the 2 wire harness clamps.

2. INSTALL NO. 1 HYBRID BATTERY INTAKE DUCT Installation

3. INSTALL REAR FLOOR BOARD SPACER Installation

4. INSTALL REAR SEAT SIDE GARNISH RH

HINT
Use the same procedure as for the LH side Installation.

5. INSTALL REAR DOOR SCUFF PLATE RH

HINT
Use the same procedure as for the LH side Installation.

6. INSTALL REAR SEATBACK ASSEMBLY RH

Installation

7. INSTALL REAR NO. 1 FLOOR BOARD Installation

8. INSTALL REAR NO. 2 FLOOR BOARD SUB-ASSEMBLY Installation

9. INSTALL REAR NO. 1 FLOOR BOARD SUB-ASSEMBLY Installation

10. INSTALL TONNEAU COVER ASSEMBLY (w/ Tonneau Cover) Installation

11. INSTALL DECK FLOOR BOX LH (w/o Woofer) Installation

12. INSTALL REAR NO. 4 FLOOR BOARD (w/ Woofer) Installation

13. INSTALL REAR NO. 4 FLOOR BOARD (w/o Woofer) Installation

14. INSTALL DECK FLOOR BOX RH Installation

15. INSTALL REAR NO. 3 FLOOR BOARD Installation

16. INSTALL REAR DECK FLOOR BOX Installation

17. INSTALL REAR NO. 2 FLOOR BOARD Installation