Operation CHARM: Car repair manuals for everyone.

Power Distribution





POWER DISTRIBUTION: INTEGRATION RELAY: INSTALLATION

1. INSTALL NO. 1 INTEGRATION RELAY

(a) Connect the 3 connectors.

(b) Engage the 2 claws to install the No. 1 integration relay as shown in the illustration.





2. INSTALL NO. 1 RELAY BLOCK COVER

(a) Engage the 3 claws to install the No. 1 relay block cover as shown in the illustration.





3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

4. INSTALL REAR FLOOR BOARD UPPER NO. 3 PLATE Installation

5. INSTALL DECK FLOOR BOX RH Installation

6. INSTALL REAR NO. 3 FLOOR BOARD Installation

7. INSTALL REAR DECK FLOOR BOX Installation

8. INSTALL REAR NO. 2 FLOOR BOARD Installation