Operation CHARM: Car repair manuals for everyone.

Installation





2ZR-FXE STARTING: POWER SWITCH: INSTALLATION

1. INSTALL POWER SWITCH

(a) Engage the 2 claws to install the power switch.

2. INSTALL METER HOOD SUB-ASSEMBLY Installation

3. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.

4. INSTALL REAR FLOOR BOARD UPPER NO. 3 PLATE Installation

5. INSTALL DECK FLOOR BOX RH Installation

6. INSTALL REAR NO. 3 FLOOR BOARD Installation

7. INSTALL REAR DECK FLOOR BOX Installation

8. INSTALL REAR NO. 2 FLOOR BOARD Installation