Installation
2GR-FSE ENGINE MECHANICAL: DRIVE BELT: INSTALLATION
1. INSTALL FAN & GENERATOR V BELT
(a) Rotate the tensioner pulley counterclockwise, and then install the V belt as shown in the illustration.
NOTICE:
Check that the drive belt is properly set to each pulley.
2. INSTALL NO. 1 AIR CLEANER INLET
(a) Install the air cleaner inlet with the bolt.
Torque : 5.0 Nm (51 kgf-cm, 44 in-lbf)
3. INSTALL COOL AIR INTAKE DUCT SEAL Installation