Operation CHARM: Car repair manuals for everyone.

Installation





2GR-FSE ENGINE CONTROL SYSTEM: KNOCK SENSOR: INSTALLATION

1. INSTALL KNOCK SENSOR

(a) Install the 2 knock sensors so that they are horizontal as shown in the illustration. Then install the 2 bolts.





Torque : 20 Nm (204 kgf-cm, 15 ft-lbf)

HINT
It is acceptable for the sensor to be tilted +10 to -5°.

(b) Connect the 2 knock sensor connectors.

2. INSTALL FUEL INJECTOR SEAL Installation

3. INSTALL FUEL INJECTOR ASSEMBLY Installation

4. INSTALL NO. 1 FUEL DELIVERY PIPE Installation

5. INSTALL NO. 2 FUEL DELIVERY PIPE Installation

6. INSTALL NO. 3 FUEL PIPE Installation

7. INSTALL NO. 2 FUEL PIPE Installation

8. INSTALL FUEL PUMP ASSEMBLY Installation

9. CONNECT NO. 2 FUEL PIPE Installation

10. INSTALL NO. 1 FUEL PIPE Installation

11. INSTALL FUEL PRESSURE PULSATION DAMPER Installation

12. INSTALL WATER HOSE JOINT Installation

13. INSTALL INTAKE MANIFOLD Installation

14. INSTALL INTAKE AIR SURGE TANK Installation

15. INSTALL THROTTLE BODY Installation

16. INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE Installation

17. CONNECT NO. 2 VENTILATION HOSE Installation

18. ADD ENGINE COOLANT Service and Repair

19. INSTALL COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY Installation

20. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY LH Installation

21. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY RH Installation

22. INSTALL FRONT FENDER TO COWL SIDE SEAL LH Installation

23. INSTALL FRONT FENDER TO COWL SIDE SEAL RH Installation

24. INSTALL FRONT UPPER FENDER PROTECTOR LH Installation

25. INSTALL FRONT UPPER FENDER PROTECTOR RH Installation

26. INSTALL SERVICE PLUG GRIP Installation

27. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

28. CHECK FOR ENGINE COOLANT LEAKAGE Testing and Inspection

29. CHECK FOR FUEL LEAKAGE Testing and Inspection

30. CHECK FUNCTION THROTTLE BODY On-Vehicle Inspection

31. INSTALL V-BANK COVER





Attach the 3 clips to install the engine cover.

32. INSTALL ENGINE ROOM SIDE COVER LH





Install the side cover with the 4 clips.

33. INSTALL ENGINE ROOM SIDE COVER RH





Install the side cover with the 3 clips.

34. INSTALL COOL AIR INTAKE DUCT SEAL





Install the intake duct seal with the 7 clips.

35. PERFORM INITIALIZATION

(a) Perform initialization Repair Instruction - Initialization.

NOTICE:
Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.